Murerleben - Ein Life plus Projekt

Implementation of measures

Measure widening - Apfelberg

The management of the wetlandsbelongs to a measure complex. By this complex, the course of the river in a length of 3.9 km, which is rich in structures has to be obtained (together with the already implemented measures Weyern-wetlands and Lässer-wetlands). The measure wetlands Apfelberg has a size of about. 2.3 ha.

The following measures are to be taken:

 

o Opening of the bank revetment in a length of about  270 m
o Lowering of the area in the size of about  2,200 m²
o Preparation of  a 310 m long branch
o Initiation of the development of wetlands in a size of about 0.5 ha
o Protection of the stand of the wetlands of about 1.0 ha
o Structuring in a length of about 2000 m
 

The implementation of this measure was start in autumn/winter 2014 and finished in winter 2015.

Actual pictures of the development you find here.

Lageplan Apfelberg