Implementation of measures

Preg - Structuring

In the area of this measure, the river Mur has a very stretched and poor structured river bed. Therefore, the objective of this measure is to devolop a more structured watercourse. As there is no room for widenings, existing structures in the river bed are to be strengthened and initiated by restructuring measures. Within the natural river bed structures there are to be build clearance cairns and fixed dead wood.

 

The measure was accomplished in summer 2011.

 

Pictures to Preg you find here.

Maßnahme Preg
Life plus Nature Project
fjrigjwwe9r0teaser_Version:trV_text
"Inner-Alpine River Basin Management for the Upper Mur"
Realisation of measures
fjrigjwwe9r0teaser_Version:trV_text

Completion of measure Preg and Mauthof in 2012.

The measure Lässer Au was finished in december 2013, the measure Feistritz in the summer of 2014.

The implementation of the measures Apfelberg, und St. Peter started in summer/autumn 2014.

GerambRose 2010
fjrigjwwe9r0teaser_Version:trV_text
River widening Weyern awarded with the GerambRose 2010